Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
The main stream of the Western Liao River has once again achieved full connectivity across the entire line in spring.
According to the Ministry of Water Resources, the water replenishment head on the XiLiao River main stream reached Anletun in Tongliao City, Inner Mongolia Autonomous Region today (April 5). It connects with the existing water surfaces downstream, and the XiLiao River main stream achieved full linkage as scheduled. This marks an important progress in spring dispatch operations, and the results of ecological dispatch have been consolidated and improved. The Ministry of Water Resources officially launched spring dispatch on March 1, making full use of various water sources such as reservoir storage, channel storage, ice-melt water, and externally diverted water to fully ensure water passage along the river. After 36 days, the replenishment head merged with the existing downstream waters, successfully achieving the goal of full linkage. (CCTV News)